File 578 · 2015 · Premià de Dalt

Restaurant-Bar Catalans

Restaurant

procedures
2
authority
1
years
2

The commission

  • Activity project
  • Prior notification
  • Technical certificate
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2015 Government of Catalonia

    Planning permission for use

    What it is. Planning permission to put a building, premises or plot to a different use, or to a use that needs specific approval, such as an activity on land not designated for development.

  2. 2
    2016 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.