aten proyectos
Projects

File 577 · 2015 · Barcelona

Ojalá

Retail

procedure
1
authority
1
year
1

The commission

  • Low-voltage electrical installation
  • Prior notification
  • Technical report

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2015 Inspection body Passed

    Extraordinary low-voltage inspection

    What it is. Inspection by an inspection body outside the usual schedule, for example to check an existing installation without records or after a modification, and verify that it complies with the REBT.

Nearby

Similar projects