File 1008 · 2022–2023 · Badalona

Banak

Furniture shop: works, activity and low voltage

procedures
5
authorities
3
years
2

The commission

A furniture and home decor chain occupied a commercial unit that had already been a furniture shop. We worked for the company carrying out the refurbishment: we wrote the works project, processed the licence, managed the works and certified their completion.

We resolved the safety requirements that the regulations set for premises of this kind and adapted the electrical installation to the available supply, leaving it ready to grow. We passed the initial inspection, registered the installation and submitted the notification of opening.

  • Building project
  • Site supervision
  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2022 Badalona City Council Granted

    Minor works licence

    What it is. Municipal permit for small-scale works which, because of their nature or the local by-law, cannot be carried out with a simple notification. It is obtained before starting, with the technical documents.

    What we did. We wrote the works project, processed the licence, managed the works and provided the certificate of completion.

  2. 2
    2023 Badalona City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

    What we did. We wrote the activity project and the technical certificate and submitted the notification of opening.

  3. 3
    2023 Inspection body Passed

    Initial low-voltage inspection

    What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.

    What we did. We prepared the electrical installation and arranged the initial inspection with the inspection body.

  4. 4
    2023 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

    What we did. We prepared the electrical installation documents and processed its registration.

  5. 5
    2023 Government of Catalonia

    Registration of the thermal installation

    What it is. Registration with the Government of Catalonia of heating, air-conditioning or hot water installations that require it because of their power, with the installer's certificate and, where required, the design (RITE).

    What we did. We coordinated with the installer the documents for the thermal installation and its registration.

The finished premises

Bedroom and dining setting in the showroom
Bedroom and dining setting in the showroom
Shop fit-out with children's furniture and basketware
Shop fit-out with children's furniture and basketware
Main electrical switchboard of the shop
Main electrical switchboard of the shop