aten proyectos
Projects

File 1007 · 2022 · Mataró

La Cossette

Retail

procedures
3
authorities
2
year
1

The commission

  • Responsible declaration
  • Technical certificate
  • Low-voltage electrical installation
  • Drawings

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2022 Mataró City Council

    Notification of low-impact activity

    What it is. Notice to the City Council to open a low-impact activity with no significant risk to the surroundings, people or property. It is the simplest regime: the holder's declaration and a few documents are usually enough.

  2. 2
    2022 Mataró City Council

    Municipal check of the activity

    What it is. Review by the City Council, on paper or through a visit to the premises, which checks that the activity matches what was submitted and the by-laws, including noise rules, and records the outcome.

  3. 3
    2022 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.