aten proyectos
Projects

File 1017 · 2022 · Sant Andreu de Llavaneres

Rostisseria Gall-Bo

Food retail

procedure
1
authority
1
year
1

The commission

  • Technical certificate
  • Technical report
  • Drawings
  • Low-voltage electrical installation

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2022 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.