File 784 · 2018 · Mollet del Vallès

Ecosanita

Food retail

procedures
3
authorities
2
years
2

The commission

  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2021 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  2. 2
    2022 Mollet del Vallès City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

  3. 3
    2022 Mollet del Vallès City Council Accepted

    Municipal check of the activity

    What it is. Review by the City Council, on paper or through a visit to the premises, which checks that the activity matches what was submitted and the by-laws, including noise rules, and records the outcome.