aten proyectos
Projects

File 437 · 2013 · Badalona

S10 Sushi & Noodles

Food retail

procedures
2
authorities
2
year
1

The commission

  • Feasibility study
  • Prior notification
  • Activity project
  • Low-voltage electrical installation
  • Site supervision
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2013 Badalona City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

  2. 2
    2013 Government of Catalonia

    Electrical design and certificate

    What it is. Technical documents for the low-voltage electrical installation: the design and the certificate confirming that it has been built as designed and in line with the Low Voltage Electrotechnical Regulation (REBT).

Nearby

Similar projects