File 349 · 2011–2012 · Barcelona

Victoria's Cakes

Patisserie with workshop and baking classes: from the premises to opening

procedures
3
authorities
3
years
2

The commission

The client wanted to open a creative patisserie with its own production kitchen, a tasting area and a space for baking classes. We helped her choose the premises: we studied several options and checked in each whether the neighbourhood's planning allowed a shop with tasting. When she found the right one, a former furniture shop, we worked out with her how to organise the space.

We wrote the activity project and the electrical project, and coordinated the works, the initial low-voltage inspection and the approved collaborating body's technical certification. We adjusted the drawings to the district's criteria and submitted the notification of opening.

We took her way of working into account, with the production kitchen and the classes at different times, so that she did not have to contract more electricity supply than she needed.

  • Feasibility study
  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2011 Approved collaborating body Passed

    Technical certification by an approved inspection body

    What it is. Review of the project and the finished works by a collaborating body accredited by the authorities, which certifies to the City Council that the activity complies with the rules. Some municipalities require it to open.

    What we did. We prepared the project documents and dealt with the approved collaborating body's review until it issued its certification.

  2. 2
    2011 Government of Catalonia

    Registration of the thermal installation

    What it is. Registration with the Government of Catalonia of heating, air-conditioning or hot water installations that require it because of their power, with the installer's certificate and, where required, the design (RITE).

    What we did. We prepared the thermal installation certificate and processed its registration.

  3. 3
    2012 Barcelona City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

    What we did. We wrote the activity project and the technical certificate and submitted the notification of opening.

The finished premises

Tasting area with white tables and a grandfather clock
Tasting area with white tables and a grandfather clock
Large table for the baking workshops, with a folding screen and flowers
Large table for the baking workshops, with a folding screen and flowers
Tasting corner with a round table, wrought-iron chairs and floral wallpaper
Tasting corner with a round table, wrought-iron chairs and floral wallpaper