aten proyectos
Projects

File 925 · 2021 · Barcelona

Neko Sushi

Food workshop

procedures
3
authorities
3
years
2

The commission

  • Activity project
  • Prior notification
  • Low-voltage electrical installation
  • Technical certificate
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2021 Barcelona City Council Accepted

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

  2. 2
    2021 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  3. 3
    2022 Approved collaborating body Accepted

    Technical certification by an approved inspection body

    What it is. Review of the project and the finished works by a collaborating body accredited by the authorities, which certifies to the City Council that the activity complies with the rules. Some municipalities require it to open.

Nearby

Similar projects