File 717 · 2017–2018 · Barcelona

Kashaya Kombucha

Kombucha production unit in an industrial building: works, activity and health registration

procedures
6
authorities
5
years
2

The commission

A young company wanted to brew and bottle kombucha on an industrial scale. We visited several premises with the client until we found a suitable industrial building, which we measured and analysed before they signed.

We wrote the works project, the activity project and the electrical project, and designed the unit's health conditions with the public health staff. We resolved the technical requirements of a food production unit next to a dwelling and made sure it could coexist with the neighbours.

With the approved collaborating body's certification we submitted the notification of opening and registered the business in the food health registers. The project grew into Bioma Kombucha.

  • Building project
  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2017 Association of Industrial Engineers Passed

    Technical suitability report

    What it is. Report by an approved collaborating body that reviews the project or the works and certifies that they meet planning and technical rules. Some councils, such as Barcelona, accept it to speed up the process.

    What we did. We wrote the works project and submitted it to obtain the technical suitability report.

  2. 2
    2017 Barcelona City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

    What we did. We resolved the preliminary enquiries and submitted the notification of the works with the technical project.

  3. 3
    2018 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

    What we did. We prepared the electrical installation documents and coordinated its registration.

  4. 4
    2018 Public Health Agency

    Registration in the food health register

    What it is. Entry in the Catalan health register of food businesses and products (RSIPAC), compulsory before starting for businesses that produce, store or distribute food.

    What we did. We advised the client and prepared the documents for the notification and registration in the food industry health register.

  5. 5
    2018 Approved collaborating body Passed

    Technical certification by an approved inspection body

    What it is. Review of the project and the finished works by a collaborating body accredited by the authorities, which certifies to the City Council that the activity complies with the rules. Some municipalities require it to open.

    What we did. We wrote the activity project and coordinated the approved collaborating body's review, visit and measurements.

  6. 6
    2018 Barcelona City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

    What we did. We submitted the notification of opening with the technical certification.

The finished premises

Stairs to the mezzanine with a steel handrail and ventilation ducts
Stairs to the mezzanine with a steel handrail and ventilation ducts