File 701 · 2017 · Barcelona

Still Cooking

Ready-meals production kitchen: design, works and health registration

procedures
6
authorities
4
year
1

The commission

Every day the client prepared meals for company canteens and needed an industrial kitchen of their own. We started from a newly built shell unit and designed the layout with them, checking the hygiene criteria with the public health staff before starting.

We processed the works with a technical suitability report and the activity with approved collaborating body certification. We met the requirements of a kitchen of this kind by making use of what the building itself offered.

We legalised the electrical installation, arranged the new supply with the distribution company and registered the production kitchen in the health register.

  • Building project
  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Building service connection

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2017 Barcelona City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

    What we did. We wrote the works project and submitted the immediate notification of the works.

  2. 2
    2017 Approved collaborating body Passed

    Technical suitability report

    What it is. Report by an approved collaborating body that reviews the project or the works and certifies that they meet planning and technical rules. Some councils, such as Barcelona, accept it to speed up the process.

    What we did. We prepared the project documents and submitted them to obtain the technical suitability report.

  3. 3
    2017 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

    What we did. We prepared the electrical installation documents and processed its registration.

  4. 4
    2017 Approved collaborating body Accepted

    Technical certification by an approved inspection body

    What it is. Review of the project and the finished works by a collaborating body accredited by the authorities, which certifies to the City Council that the activity complies with the rules. Some municipalities require it to open.

    What we did. We dealt with the approved collaborating body's review until it issued its technical certification.

  5. 5
    2017 Barcelona City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

    What we did. We wrote the activity project and the technical certificate and submitted the notification of opening.

  6. 6
    2017 Inspection body Passed

    Extraordinary low-voltage inspection

    What it is. Inspection by an inspection body outside the usual schedule, for example to check an existing installation without records or after a modification, and verify that it complies with the REBT.

    What we did. We coordinated with the inspection body the verification of the electrical installation.

The finished premises

Building roof terrace with the extraction flue outlet
Building roof terrace with the extraction flue outlet
Kitchen electrical switchboard with labelled circuits
Kitchen electrical switchboard with labelled circuits