aten proyectos
Projects

File 807 · 2019 · Barcelona

Orimaki

Food retail

procedures
6
authorities
3
year
1

The commission

  • Building project
  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Fire protection
  • Drawings
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2019 Barcelona City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

  2. 2
    2019 Approved collaborating body Passed

    Technical suitability report

    What it is. Report by an approved collaborating body that reviews the project or the works and certifies that they meet planning and technical rules. Some councils, such as Barcelona, accept it to speed up the process.

  3. 3
    2019 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  4. 4
    2019 Government of Catalonia

    Registration of the fire-protection installation

    What it is. Registration with the Government of Catalonia of fire-protection installations, such as extinguishers, fire hose reels or automatic detection or suppression systems, with the installer's certificate (RIPCI).

  5. 5
    2019 Approved collaborating body Passed

    Technical certification by an approved inspection body

    What it is. Review of the project and the finished works by a collaborating body accredited by the authorities, which certifies to the City Council that the activity complies with the rules. Some municipalities require it to open.

  6. 6
    2019 Barcelona City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

Nearby

Similar projects