File 375 · 2011 · Barcelona

Daniela Bakery

Shop with tasting area

procedures
4
authorities
2
years
2

The commission

  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Site supervision
  • Terrace licence
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2011 Inspection body

    Fire-protection inspection

    What it is. Inspection by an inspection body of fire-protection installations or passive fire protection, such as coatings on structures or floor slabs, to check that they meet fire safety rules.

  2. 2
    2012 Barcelona City Council Passed

    Planning report

    What it is. Report by the City Council stating whether a use or activity is compatible with the planning rules at a specific location. It is best requested before committing to the premises or submitting the project.

  3. 3
    2012 Inspection body Passed

    Technical certification by an approved inspection body

    What it is. Review of the project and the finished works by a collaborating body accredited by the authorities, which certifies to the City Council that the activity complies with the rules. Some municipalities require it to open.

  4. 4
    2012 Barcelona City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.