File 268 · 2009 · Badalona

Spicy Fried Chicken

Restaurant

procedures
3
authorities
2
years
2

The commission

  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Building project

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2009 Government of Catalonia

    Electrical design and certificate

    What it is. Technical documents for the low-voltage electrical installation: the design and the certificate confirming that it has been built as designed and in line with the Low Voltage Electrotechnical Regulation (REBT).

  2. 2
    2010 Badalona City Council

    Prior environmental notification

    What it is. Notice to the City Council to open an activity with moderate environmental impact (Annex III, Catalan Law 20/2009), together with a project and a technical certificate showing it meets environmental rules.

  3. 3
    2010 Badalona City Council

    Technical certificate of the activity

    What it is. Document signed by the engineer certifying that the premises and their installations have been built as designed and comply with the applicable rules. It is submitted to the City Council in order to open.