File 835 · 2019 · Badalona

Limpiezas Lina

Office

procedures
4
authorities
2
years
2

The commission

  • Building project
  • Site supervision
  • Responsible declaration
  • Technical certificate
  • Low-voltage electrical installation
  • Drawings

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2020 Badalona City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

  2. 2
    2020 Badalona City Council Granted

    Major works licence

    What it is. Municipal permit for major works, such as those affecting the structure, changing the use or layout of the building or demolishing a construction. It requires a technical project and is obtained before starting.

  3. 3
    2021 Badalona City Council

    Change to the activity

    What it is. Notice to the City Council of changes to an already authorised activity, such as enlarging the floor area or adding a terrace or a secondary use, so that its permit reflects the actual situation.

  4. 4
    2021 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.