Technical project
What it is. Document drawn up and signed by the engineer describing and justifying the premises, activity, works or installations and showing that they comply with the rules. It is the technical basis of most procedures.
The commission
Procedures
What it is. Document drawn up and signed by the engineer describing and justifying the premises, activity, works or installations and showing that they comply with the rules. It is the technical basis of most procedures.
What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.
What it is. Permits from the distribution company to connect a generating installation, such as a solar PV system, or a sizeable load to its grid. They confirm grid capacity and set the connection point.
What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.