File 1269 · 2026 · Terrassa

El Carnal Cantina

Bar and café

procedures
2
authority
1
year
1

The commission

  • Periodic inspection
  • Technical certificate
  • Low-voltage electrical installation
  • Technical advice
  • Recovery of licence records

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2026 Inspection body Passed

    Periodic low-voltage inspection

    What it is. Compulsory inspection by an inspection body, every five years in most cases, of the electrical installations of premises open to the public, industrial sites and others required by the REBT.

  2. 2
    2026 Inspection body

    Periodic environmental inspection

    What it is. Inspection repeated every few years to check that an activity with an environmental licence or notification still meets the conditions under which it was authorised (Catalan Law 20/2009).