File 1161 · 2024 · Terrassa

Solar PV installation

procedures
3
authority
1
year
1

The commission

  • Solar PV installation
  • Low-voltage electrical installation

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2025 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  2. 2
    2025 Government of Catalonia

    Operating authorisation

    What it is. Decision by the Government of Catalonia allowing a completed electricity generating installation to start operating, together with its final entry in the production or self-consumption register.

  3. 3
    2025 Government of Catalonia

    Registration in the self-consumption register

    What it is. Entry of the installation in the Government of Catalonia's self-consumption register, which passes its details to the distribution company and the retailer so self-consumption and any surplus compensation apply.