File Q8-Q02 · 2022–2026 · Terrassa

Q8

Service station: photovoltaic self-consumption installation

procedures
4
authorities
2
years
3

The commission

A roadside service station wanted to produce its own electricity using the roofs of its canopy and building. With the installer we studied how to make the most of them. The station is on land under a special planning regime, so the work needed more than a notification: we wrote the project, the landscape impact and integration study and the temporary use project that the planning rules require for this land.

We legalised the self-consumption installation and registered it in the Government of Catalonia's registers. We accompanied the client through the European Next Generation funding up to its final justification. In its first years of operation, the installation produced what the project had forecast.

  • Solar PV installation
  • Building project

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2022 Terrassa City Council

    Building works licence

    What it is. Municipal permit to carry out works in a building or premises when a prior notification is not enough. It is applied for with the technical documents and obtained before starting.

    What we did. We wrote the project and the landscape integration study and submitted the works licence application.

  2. 2
    2023 Terrassa City Council

    Temporary use licence

    What it is. Municipal permit for a temporary use or temporary works until the planned development goes ahead. The City Council may revoke it when needed, without compensation.

    What we did. We wrote the temporary use project that the planning rules require for this type of land.

  3. 3
    2023 Government of Catalonia

    Registration in the self-consumption register

    What it is. Entry of the installation in the Government of Catalonia's self-consumption register, which passes its details to the distribution company and the retailer so self-consumption and any surplus compensation apply.

    What we did. We legalised the self-consumption installation and processed its registration in the Government of Catalonia's registers.

  4. 4
    2026 Government of Catalonia

    Public grant

    What it is. Application for, award and reporting of a public grant, for example for self-consumption or energy efficiency, with the technical documents required by the call.

    What we did. We accompanied the client through the European Next Generation funding up to its final justification.

The finished premises

Rows of modules on the canopy's metal roof
Rows of modules on the canopy's metal roof
Array of modules on the roof, with the town in the background
Array of modules on the roof, with the town in the background
Modules on the metal-sheet roof during installation
Modules on the metal-sheet roof during installation