aten proyectos
Projects

File 1093 · 2023 · Sant Feliu de Guíxols

Solar PV installation

procedures
6
authorities
4
years
2

The commission

  • Solar PV installation
  • Building project
  • Technical certificate
  • Low-voltage electrical installation
  • Other work

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2023 Sant Feliu de Guíxols City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

  2. 2
    2023 Distribution company

    Grid access and connection with the distribution company

    What it is. Permits from the distribution company to connect a generating installation, such as a solar PV system, or a sizeable load to its grid. They confirm grid capacity and set the connection point.

  3. 3
    2023 Government of Catalonia

    Public grant

    What it is. Application for, award and reporting of a public grant, for example for self-consumption or energy efficiency, with the technical documents required by the call.

  4. 4
    2023 Inspection body Passed

    Initial low-voltage inspection

    What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.

  5. 5
    2024 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  6. 6
    2024 Government of Catalonia

    Operating authorisation

    What it is. Decision by the Government of Catalonia allowing a completed electricity generating installation to start operating, together with its final entry in the production or self-consumption register.