File 1173 · 2024 · Bigues i Riells del Fai

Solar PV installation

procedures
5
authorities
4
years
2

The commission

  • Solar PV installation
  • Technical certificate
  • Low-voltage electrical installation

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2023 Association of Industrial Engineers

    Professional body endorsement

    What it is. Check by the Association of Industrial Engineers on a project or certificate: it verifies the engineer's identity and qualifications and the formal correctness of the document. Some authorities require it.

  2. 2
    2024 Inspection body Passed

    Initial low-voltage inspection

    What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.

  3. 3
    2024 Distribution company

    Grid access and connection with the distribution company

    What it is. Permits from the distribution company to connect a generating installation, such as a solar PV system, or a sizeable load to its grid. They confirm grid capacity and set the connection point.

  4. 4
    2024 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  5. 5
    2024 Government of Catalonia

    Operating authorisation

    What it is. Decision by the Government of Catalonia allowing a completed electricity generating installation to start operating, together with its final entry in the production or self-consumption register.