aten proyectos
Projects

File 1112 · 2024 · Creixell

Solar PV installation

procedure
1
authority
1
year
1

The commission

  • Solar PV installation
  • Low-voltage electrical installation

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2024 Government of Catalonia

    Legalisation of the self-consumption installation

    What it is. Registration with the Government of Catalonia of a solar PV or other low-voltage generating installation, with its certificate and, where required, the design, as a step before commissioning it.