File 1189 · 2024 · Blanes

La IAIA Nita

Bar and café

procedures
4
authorities
3
year
1

The commission

  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2025 Inspection body Passed

    Initial low-voltage inspection

    What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.

  2. 2
    2025 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  3. 3
    2025 Blanes City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

  4. 4
    2025 Blanes City Council

    Responsible declaration on health requirements

    What it is. Statement by the holder to the health authority that the premises, such as a food shop or a beauty centre, meet the hygiene and health safety requirements for their activity.