File 1068 · 2023 · Terrassa

Solar PV installation

procedures
3
authorities
2
years
2

The commission

  • Solar PV installation
  • Low-voltage electrical installation

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2023 Government of Catalonia

    Legalisation of the self-consumption installation

    What it is. Registration with the Government of Catalonia of a solar PV or other low-voltage generating installation, with its certificate and, where required, the design, as a step before commissioning it.

  2. 2
    2024 Government of Catalonia

    Operating authorisation

    What it is. Decision by the Government of Catalonia allowing a completed electricity generating installation to start operating, together with its final entry in the production or self-consumption register.

  3. 3
    2024 Distribution company

    Supply arrangements with the distribution company

    What it is. Arrangements with the distribution company for an existing electricity supply, such as a change of holder, meter replacement or verification of metering.