aten proyectos
Projects

File 655 · 2016 · Barcelona

Timesburg

Restaurant

procedures
6
authorities
4
year
1

The commission

  • Building project
  • Activity project
  • Prior notification
  • Technical certificate
  • Low-voltage electrical installation
  • Terrace licence
  • Drawings

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2016 Distribution company

    Power upgrade with the distribution company

    What it is. Request to the distribution company to increase the electrical power available to a supply. It may involve work on the service connection and payment of extension and access charges.

  2. 2
    2016 Government of Catalonia

    Registration of the thermal installation

    What it is. Registration with the Government of Catalonia of heating, air-conditioning or hot water installations that require it because of their power, with the installer's certificate and, where required, the design (RITE).

  3. 3
    2016 Barcelona City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

  4. 4
    2016 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  5. 5
    2016 Approved collaborating body

    Technical certification by an approved inspection body

    What it is. Review of the project and the finished works by a collaborating body accredited by the authorities, which certifies to the City Council that the activity complies with the rules. Some municipalities require it to open.

  6. 6
    2016 Barcelona City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

Nearby

Similar projects