File 429 · 2012 · Sant Cugat del Vallès

Sushi & Wok

Restaurant

procedures
2
authorities
2
years
2

The commission

  • Technical report
  • Low-voltage electrical installation
  • Technical certificate
  • Prior notification
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2012 Sant Cugat del Vallès City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

  2. 2
    2013 Inspection body Passed

    Initial low-voltage inspection

    What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.