aten proyectos
Projects

File 599 · 2015 · Vilafranca del Penedès

Healthcare centre

procedures
5
authorities
4
years
2

The commission

  • Feasibility study
  • Building project
  • Prior notification
  • Low-voltage electrical installation
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2015 Distribution company

    New electricity supply

    What it is. Request to the distribution company for a new electricity supply point, including a temporary supply for building works. The company sets the technical and financial terms for connecting to its grid.

  2. 2
    2015 Vilafranca del Penedès City Council

    Minor works licence

    What it is. Municipal permit for small-scale works which, because of their nature or the local by-law, cannot be carried out with a simple notification. It is obtained before starting, with the technical documents.

  3. 3
    2016 Inspection body Passed

    Initial low-voltage inspection

    What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.

  4. 4
    2016 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  5. 5
    2016 Vilafranca del Penedès City Council

    Notification of low-impact activity

    What it is. Notice to the City Council to open a low-impact activity with no significant risk to the surroundings, people or property. It is the simplest regime: the holder's declaration and a few documents are usually enough.

Nearby

Similar projects