aten proyectos
Projects

File 1103 · 2023 · Sant Feliu de Llobregat

Quiropràctic Sant Feliu

Healthcare centre

procedures
5
authorities
2
years
2

The commission

  • Building project
  • Site supervision
  • Prior notification
  • Activity project
  • Technical certificate
  • Low-voltage electrical installation
  • Technical advice
  • Other work

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2024 Sant Feliu de Llobregat City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

  2. 2
    2024 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

  3. 3
    2024 Sant Feliu de Llobregat City Council

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

  4. 4
    2024 Sant Feliu de Llobregat City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

  5. 5
    2025 Sant Feliu de Llobregat City Council Passed

    Municipal check of the activity

    What it is. Review by the City Council, on paper or through a visit to the premises, which checks that the activity matches what was submitted and the by-laws, including noise rules, and records the outcome.

Nearby

Similar projects