Technical project
What it is. Document drawn up and signed by the engineer describing and justifying the premises, activity, works or installations and showing that they comply with the rules. It is the technical basis of most procedures.
The commission
Procedures
What it is. Document drawn up and signed by the engineer describing and justifying the premises, activity, works or installations and showing that they comply with the rules. It is the technical basis of most procedures.
What it is. Document signed by the engineer certifying that the premises and their installations have been built as designed and comply with the applicable rules. It is submitted to the City Council in order to open.
What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.