aten proyectos
Projects

File 431 · 2012 · Sant Andreu de la Barca

Tot i molt més

Retail

procedure
1
authority
1
year
1

The commission

  • Low-voltage electrical installation
  • Technical certificate
  • Site supervision

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2012 Inspection body

    Initial low-voltage inspection

    What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.