File 347 · 2011 · Barcelona

Taberna Etxeko

Bar and café

procedures
3
authority
1
year
1

The commission

  • Activity project
  • Environmental licence
  • Terrace licence
  • Low-voltage electrical installation
  • Drawings
  • Technical report
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2011 Barcelona City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

  2. 2
    2011 Barcelona City Council

    Planning report

    What it is. Report by the City Council stating whether a use or activity is compatible with the planning rules at a specific location. It is best requested before committing to the premises or submitting the project.

  3. 3
    2011 Barcelona City Council

    Environmental licence

    What it is. Permit granted by the City Council, after an environmental report and a public consultation period, to activities with greater environmental impact (Annex II, Catalan Law 20/2009). It must be obtained before starting.