File 953-05 · 2021 · La Torre de Claramunt
The commission
Solar PV installation
La Torre de Claramunt
1.6 km away
Piera (Urb. Can Mata)
5.3 km away
Rostisseria Piera
Food retail · Igualada
6.2 km away
El Bruc
10.6 km away
Collbató
10.9 km away
11.9 km away
Masquefa
3 procedures · Distribution company
12 km away
Q8
Photovoltaic installation at a service station · Terrassa
4 procedures · Terrassa City Council
Terrassa
Corbera de Llobregat
Castellbisbal