File 1215 · 2025–2026 · Barcelona

Urban Driving Range

Indoor golf with bar: works, low voltage and notification of activity

procedures
6
authorities
4
years
2

The commission

The client was setting up an indoor golf venue with simulators, a putting green and a complementary bar. We took over representing the client in the procedure, with the planning report already obtained, and handled the rest: works project, suitability report, technical management, electrical installation and notification of the activity.

Ball strikes and music made sound insulation the key point, which we resolved on the basis of the acoustic study. We also saw to the discreet integration of the installations in the façade. With the initial low-voltage inspection passed and the installation registered, we submitted the notification of the activity.

  • Building project
  • Activity project
  • Prior notification
  • Low-voltage electrical installation
  • Technical advice

Procedures

Step by step, from the first visit to the final paperwork.

  1. 1
    2025 Barcelona City Council Passed

    Planning report

    What it is. Report by the City Council stating whether a use or activity is compatible with the planning rules at a specific location. It is best requested before committing to the premises or submitting the project.

    What we did. We took over representing the client in the procedure and used the favourable planning report to plan the remaining procedures.

  2. 2
    2025 Barcelona City Council

    Prior notification of works

    What it is. Notice to the City Council, before starting, of simple works that need no licence, such as interior refurbishments not affecting the structure, signs or solar panels. Depending on the works, technical documents are attached.

    What we did. We wrote the works project and submitted the notification of the refurbishment works.

  3. 3
    2025 Approved collaborating body

    Technical suitability report

    What it is. Report by an approved collaborating body that reviews the project or the works and certifies that they meet planning and technical rules. Some councils, such as Barcelona, accept it to speed up the process.

    What we did. We prepared the works documents and submitted them to obtain the technical suitability report.

  4. 4
    2025 Inspection body Passed

    Initial low-voltage inspection

    What it is. Inspection by an inspection body before commissioning electrical installations that require it because of their power or use, such as premises open to the public. It checks compliance with the REBT.

    What we did. We prepared the electrical installation and arranged the initial inspection with the inspection body.

  5. 5
    2025 Government of Catalonia

    Registration of the low-voltage installation

    What it is. Registration of the low-voltage electrical installation with the Government of Catalonia, with the installer's certificate and, where needed, the design and initial inspection. It is essential to contract the power supply.

    What we did. We prepared the electrical installation documents and processed its registration.

  6. 6
    2026 Barcelona City Council Accepted

    Prior notification of opening

    What it is. Notice to the City Council, with the technical documents, that a business not requiring a licence is about to open. The council reviews it and may inspect the premises after opening.

    What we did. We wrote the activity project and submitted the notification of the activity.

The finished premises

Electrical switchboard of the venue with labelled circuits
Electrical switchboard of the venue with labelled circuits